CHELMSFORD
Nine New Build Apartments
Construction Dates: 2018-2022
Project Value: £1.8M
- The land was purchased with planning permission in place for the erection of a new build block.
- A vaulted roof was formed to maximise the space along with a number of roof windows to allow natural light to flood the mezzanine floor.
- A bespoke glass baluster was installed along the staircase with a grand finish.