5 New Commercial Units
Construction Dates: 2021-2022
Project Value: £300K


These are part of the architectural drawings we had prepared for the proposal, and were used to form part of the documents in succesfully obtaining planning permission.


Here is an image of the roof under construction, the timber roof joists are exposed in preparation of forming the warm roof deck.


The shell structure is taking shape, with the steel beams, and timber roof and wall construction well under way.


Roof and walls have been plasterboarded ready for plastering and final finishes.