The original property was too small for the growing family, and was in need of a refurbishment.
« of 3 »

TOWER HAMLETS

Triple storey side extension and loft extension.

Construction Dates: 2018-2019

Project Value: £300K

  • The footprint of the property was increased by over double the original area.
  • The original property was too small for the growing family, and was in need of a refurbishment.